Maintenance Work at the CGC

The Canada Games Centre (CGC) was built 20 years ago. As an aging facility entering its third decade of operation, the CGC will need ongoing maintenance to keep it operational.

The City is committed to investing in the CGC to maintain existing service levels and ensure the facility can continue to provide high-quality recreational opportunities for residents and user groups for decades to come. We are also committed to keep residents informed about work that will impact their use of the CGC.

On this page you can find information about upcoming maintenance work occurring at the CGC. Check back for updates.

Maintenance work at the CGC will impact use of the facility, including the need to close off sections of the building to the public for periods of time.

The City aims to minimize impacts on users as much as possible. Much of the maintenance work is subject to contractor availability, especially work that requires specialized contractors. However, the City works closely with user groups to minimize impacts through scheduling and alternative programming.

 

Upcoming projects – 2025

 

Wellness Centre Biannual Deep-Cleaning

The Wellness Centre Flooring has its biannual cleaning on Saturday, June 21.

In preperation the gym will close at 1 p.m. on Friday, June 20.

Wellness Centre hours on Friday, June 20 will be 5:30 a.m. – 1 p.m.

 

Annual Pool Maintenance 

The Whitehorse Lions Aquatic Centre will be closed for its annual maintenance starting in August.

Initial preparation work for this year’s shutdown identified more significant repairs than initially anticipated. As a result, this year’s shutdown is expected to last from 8-10 weeks.

Details are still being confirmed, including alternative programming.

The Last Splash is schedule for August 8.


ATCO Ice Rink Maintenance

The ATCO Ice Rink will be out of commission from August 25 to September 15, 2025, for maintenance.

Ice will be re-installed after the maintenance is complete, and bookings will resume on September 28.

Impacted user groups have been notified directly and will be accommodated at the NWTel Ice Rink and Takhini Arena.